My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP26434
DRMS
>
Back File Migration
>
Report
>
REP26434
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:57:39 PM
Creation date
11/27/2007 4:29:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986124
IBM Index Class Name
Report
Doc Date
10/30/1995
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS-110 [2] ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />C <br />Notice of Inten -" ~""99y'••'~~'~ ig Operations <br />110(2) Annual neuu~ ~ Rl=e`EiVED <br />Permittee Name: Popejoy Construction Co Inc OCT 3 0 1995 <br />Permit No: M-86-124 <br />Operation Name: Cecil II Gravel Pit* DivisionolMineralstsGeology <br />Anniversary Date: 10/24/95 <br />Total: $225.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: See,ngp b. County where mine is located: wAS GTON <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES ~i <br />Does this mine operate MORE or LESS than 180 days per year? MORE LESS <br />Do you extract MORE or LESS than 70,000 tons of mineral or <br />3 <br />4 <br />5 <br />6 <br />7 <br />overburden a year? MORE LESS <br />Does this mine have a phased reclamation plan? YES NO <br />Total acres affected during the report year:* 1 <br />Total acres reclaimed for the report year:* o <br />Total acres in various stages of reclamation:* <br />a. Backfilled: d. Topsoil replaced: <br />b. Graded: Average topsoil thickness <br />c. Seeded: replaced: <br />List species seeded & seeding <br />rate for report year on back <br />The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* <br />8. Estimated total acres to be affected in the next report year:* NONE <br />9. COMMENTS: THIS PIT IS LOCATED <br />PERFORMED DUE TO THE FACT THAT THERE IS NO TOPSOIL AT TNF SiTr aNn Nn <br />STRIPPING WAS REQUIRED TO MINE THE SAND <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />** NOIE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: ~ ~L, iflCKc~-'~- Date: 10/22/1995 <br />Please type or print current contact name, mailing address, and phone number below <br /> / <br />COntdCt Ndme: ERIC K. SCHWEIN Phone: (316 >i56 -~L04 <br />Company: POPEJOY CONSTRUCTION CO. , INC. <br />Address: P.O. Box 385 <br /> ULYSSES, KS 67880 ~q <br /> 9 <br />~ <br /> <br />F <br />d <br />l T <br />ID N <br />l S <br />S <br />i <br />i• N <br />48-0582907 ~ <br />Jy <br />y-~ <br />era <br />ax <br />e <br />o. or <br />a <br />ecur <br />oc <br />o.: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.