My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-27_REPORT - M2001005
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2001005
>
2003-05-27_REPORT - M2001005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 2:29:43 PM
Creation date
11/27/2007 4:29:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001005
IBM Index Class Name
Report
Doc Date
5/27/2003
Doc Name
Annual Fee/Report/Map
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2003 Annual Report <br />Grisenti Farms Gravel Pit <br />M-2001-005 <br />Castle Concrete Company RECEIVED <br />Anniversary Date: May 23 <br />MAY 2 7 2003 <br />Division of Minerals and Geolo'y <br />Overview of Permit Year: No activity occurred. <br />Annual Report Map: Although no activity has taken place at this site, the Annual Report <br />Map shows the future layout of the mining operation. This map was taken from the 112 <br />application. <br />Activity: This site is inactive. No ground has been broken. <br />Reclamation: No reclamation has taken place since no land has been disturbed. <br />Expected Activity: Mining will begin at this pit as soon as the nearby mining operation at <br />Holnam concludes. If the market demand for rock is strong Castle could begin stripping in <br />five months. If the demand for rock is slow Castle might not begin at Grisenti for another <br />14-18 months. <br />
The URL can be used to link to this page
Your browser does not support the video tag.