Laserfiche WebLink
N <br />O <br />N <br />~' <br />n <br />H <br />O <br /> <br />at PROJECT: Bowle q2, Gob Pile <br />S[TE LOCATION: Howie. CO <br />CLIENT: BowieResaureca <br />'ITS TP31' LOCATION <br />~ NO <br />N <br />m <br />v <br />ftl <br />tv <br />m <br />v <br />~+ <br />a <br />.y <br />-c <br />0 <br />a <br />q <br />tt <br />4 <br />C <br />• <br />.0 <br />E <br />J <br />1. <br />u <br />Y W <br />Di <br />O ~ <br />z ~ <br />~, o <br />» M <br />o Q <br />o p <br />., <br />;~ <br />RELATIVE COMPACTION TEST RESULTS <br />PROJECT NO: M02001MT DATE: Tuesduy,12-17-02 <br />ENGiNEERllvG TECHlNIC41N; Hayes <br />NUCLEAR GAUGE USED: l8 <br />IIBPTH OR PR,Oat: Pl ROC7'l~ R lUls7 RE DR5' M11Ur3TURE REL1T[v!i <br />EI,RVATION OFTTII DFT'SITY CONTENT DENSITY COM'CNT COa1PACPIUN <br />RECEIVED <br />JAN 15 2003 <br />Division of Minerals & Geology <br />30I1.'l YP6 i~ <br />1 Nortll side of gob pile Top Lift 8 83.0 13.0 1019 8.3 100 Coal gob, black <br />2 Wcst side of gob pile 8 83.0 13.0 85.3 9.1 100 " <br />3 South sideofgobpile B 83.0 13,0 80.7 10.7 97 " <br />4 East side of gob pile 8 83.0 13.0 78,7 11.6 95 <br />S Center ofgob pile 8 B].0 l3A 84.6 8.4 l00 " <br />tel';tvlArcn,: Jlle test reruns mutcare only me density end moisture content for the location and clevatlon tested only <br />`~xm.~r~r# ~xxt.~ ~.~~taz#~~ <br />PROJECT NUMBER? M0.007NJT <br />