My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP26312
DRMS
>
Back File Migration
>
Report
>
REP26312
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:57:35 PM
Creation date
11/27/2007 4:27:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977036
IBM Index Class Name
Report
Doc Date
10/13/1983
Doc Name
ANNUAL REPORT MLR FN 77-36 GREELEY PIT
From
MOBILE PREMIX INC
To
MLRB
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- iii iiiiiiiiiiiu iii ~ <br />General Sales <br />. ~ Greeley 352-6574 <br />Ft. Collins 484-0995 <br /> Brighton 659-2614 <br /> Ready Mixed Concrete <br /> <br />MOBILE PREMIX <br />INC Greeley 352-8411 <br />Ft. ~°"ins 484-, 52, <br />~ . Windsor 686-7769 <br />P.O. Box 1647 625 3rd Street, Greeley, Colorado 80632 • 303-352-6574 <br />~ ~~ <br />Colorado Mined Land Reclamation Board October 13, 1983 <br />1313 Sherman Street Suite #423 <br />Denver, Colorado 80203 <br />Gentlemen, <br />Re Annual Report, MLR File NO. 77-36, Greeley Pit <br />Our files indicate that the anniversary date for this permit <br />is October 30, 1983. Mining continued in Stage One-Two as <br />outlined in the Technical Revision accepted October 24, 1979. <br />We expect to complete mining in Stage One-Two sometime during <br />1984. We have submitted a Technical Revision that requests <br />changes be made to the shapes of Stages Three, Four and Five. <br />We will deal specifically with each of the Annual Report <br />questions as outlined in Section 2.41 of the Rules and <br />Regulations. <br />2.41 (1) Reference is made to the enclosed Annual Report <br />Map. Mining continued on approximately 8.33 acres <br />in Stage One-Two. Of this 8.33 acres, 2.97 acres +/- <br />(in yellow) was mined to total depth with the <br />remaining 5.36 acres +/- (in yellow-green) being <br />partially mined. <br />(2) No reclamation was required this year. <br />(3) None. <br />(4) Not applicable. <br />(5) Not applicable. <br />(6) Not applicable. <br />(7) Mining will continue on the remaining 5.36 acres <br />+/- (yellow-green) in Stage One-Two until that <br />stage is complete. We will then move into Stage <br />Three where we expect to disturb approximately <br />10.03 acres +/- (dark green). See the attached <br />map for location. <br />O~ ~ ~ <br />;.. ;~ ; <br />J <br />1100 RIVERSIDE - FT. COLLINS, C080521 - 303484-0995 ® ~ ®~_ <br />°ecomorn r- Ready Mixed Concrete - Masonry Building Supplies -seav ree~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.