My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP26157
DRMS
>
Back File Migration
>
Report
>
REP26157
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:57:29 PM
Creation date
11/27/2007 4:25:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983033
IBM Index Class Name
Report
Doc Date
8/27/1985
Doc Name
ALBERT R FREI WALSTRUM MINE PN M-83-33 ANNUAL REPORT
To
MLRB
Permit Index Doc Type
ANNUAL FEE/REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~. ; ,. o - - <br />_ QIIQIDQIQQI~OQQ~01~ ° ~~~~~~I <br />~_~ .~ 999 ra~Ll <br />5650 east ast>, Aaenue AUf' 2 7198 <br />9enderson, Colorado 80640 <br />RAINED LAND <br />ftECLAMFITION DIVISIOP! <br />June 24, 1985 <br />Colorado Mined Land Reclamation Board <br />1313 Sherman Street, Suite 423 <br />Denver, Colorado 80203 <br />Gentlemen, <br />Re Albert R. Frei, Walstrum Mine <br />HI. L. R. Permit No. 83-33, Annual Report <br />Our files indicate that the a~tniversary date for this permit is <br />June 23. Construction of the entrance road has continued in <br />Stage 1. Some of the material from the entrance road area is <br />being used in construction of the acceleration/deceleration lanes <br />on U.S. 6. These lanes are scheduled to be complete within the <br />next 18 months. We have been in contact with Pir. Bert Weaver of <br />the Clear Creek Planning Department with regards to the pending final <br />a ppcoval. of the O.D.P. We expect to have this final approval <br />before the July Board Hearing. The county has placed certain <br />restrictions on the uses of Stages Pe, Pw and A. Please refer to <br />the Annual Report map for the locations of areas discussed in this <br />report. <br />47e will deal specifically with each of the Annual Report <br />questions as outlined in Section 2.41 of the Rules and Regulations. <br />2.41 (1) Construction of the entrance road in Stage 1 has <br />continued this year. Approximately 3.00 Acres have been <br />stripped in preparation to the commencement of mininy <br />according to the approved mining plan. Stages Pe and Pw <br />are still in use with backfilling in Staye Pe to be <br />completed within the next year. Storage of growth <br />medium began on Stage A this year. Approximately <br />3.00 acres have been disturbed in 1984-1985 (see map, <br />areas colored yellow). With mining continuing in the <br />3.08 acres +/- disturbed last year. As mining opens a <br />larger work area, material storage areas will be <br />relocated in the mine proper. <br />(2) No reclamation was required during this time period. <br />
The URL can be used to link to this page
Your browser does not support the video tag.