Laserfiche WebLink
.'. <br />Listed below is additional information: <br />1. Location and numbers of acres affected this year: <br />SE'„ NE';, E%„ SE', of Section 5, T 3 S, R 70 W, and SW';, NWa, AND W%2, SW'-;, <br />Section 4, T 3 S, R 70 W, Jefferson Co. <br />61 total acres, 7 operation. <br />2. Number of acres reclaimed this year: <br />Surface areas reclaimed: 1 (plus reseeded approximately 4 acres in May, 1983) <br />3. Number of acres in various stages of reclamation: <br />Acres backfilled: 1 <br />Acres graded: 1 <br />Topsoil acres replaced: 1 <br />Acres revegetated: 1 surface area (9 to date). <br />4. Species of vegetation planted, the locations and approximate dates of planting: <br />Species: 20% Rye, 57 Blue Grama, 75% Wheat Grass. <br />This mixture is being used on all the seeding areas (level surface area, berms, <br />and road backslopes.) <br />Approximate dates of planting: <br />October, 1980; April, 1981, October, 1981: October, 1982; May, 1983. <br />5. No fertilizers required to date. <br />6. Appraisal of the success of reclamation efforts: <br />We feel our established seed areas are going to again be successful. We have <br />found that rolling or compacting the seed into the topsoil is necessary to <br />prevent wind loss and insure a higher rate of ground cover. <br />7. Estimate of the number of acres to be affected this coming year: <br />We anticipated one acre will be started beginning this fall season. This <br />acre will be a continuation to the west from the berm area on the extreme <br />east end of the property. Hauling and leveling of the topsoil will again <br />commence within the next few months prior to seeding. <br />Respectfully submitted, <br />ASPHALT P//A//VING CO. <br />~/ ~ ~~'S~ <br />V ~ <br />Je Keller <br />Project Manager <br />JK:nb <br />Encl. <br />