Laserfiche WebLink
2003-2004 Annual Report <br />Canyon Dolomite Quarry <br />M-1977-376 <br />Castle Concrete Company <br />Anniversary Date: September 22 <br />Overview of 2003-2004 Permit Year: The 2003-2004 permit yeaz for this operation <br />entailed routine activity. This activity included contract crushing/screening of previously <br />mined material, stockpiling, and load-out. No new mining, drilling, or blasting occurred <br />during this period. <br />Annual Report Maps: The enclosed map is from 1988. The map depicts the active <br />mining operation as well as the permit boundary and the haul road. Attached to the map <br />is a legend. <br />Affected Lands: The amount of affected land has not changed. <br />Reclamation: During the summer of 2004 road grading occurred. During the road <br />grading, work was also performed on some bar ditches. No new revegetation occurred at <br />this site during the permit yeaz. <br />Expected Activity (2004-2005): Routine operations are expected to occur throughout <br />the upcoming permit year. Contract crushing/screening will occur. Depending on sales <br />and demand there may be a need to drill and blast for more mine run material in the <br />upcoming permit yeaz. <br />