Laserfiche WebLink
SNOWCAP COAL COMPANY <br />Cameo Refuse Disposal Area No. 2 Inspection - 4th Quarter 2004 <br />On December 27, 2004, I performed the required quarterly visual inspection of the <br />Cameo Refuse Disposal Area No. 2 in accordance with Rule 4.10.2. <br />I, J. E. Stover, P.E., have a wide variety of experience in the design and construction of <br />earth fill embankments. Nothing was observed during the inspection that would indicate <br />the pile has a potential for failure. The pile was dry to damp except for patches of snow <br />located in shaded areas and north facing slopes. No seepage was noted around the <br />pile. The upper diversion ditch was inspected with no problems noted. The pile has <br />been covered with the required 24 inches of non-toxic material. <br />The pile is located in a remote area well away from human habitation. A failure of the <br />pile might damage the haul road and sediment pond located below the pile. However, <br />a failure of the pile would probably not be a hazard to human life. <br />I certify that to the best of my knowledge and belief, that the fill and other aspects of the <br />Cameo No. 2 refuse pile have been constructed as permitted in the design approved by <br />the DMG. <br />9~C ij ~ ~~~ <br />Recommended maintenance: None ~®~ ;°°°"= t~:r~,~ <br />• o o,. ~. <br />:e <br />3 <br />~•~, A~ <br />J~FH65 C. JWVer ~ ~® <br />P.~°,~, 19230 ~~~,~®® <br />~~00~.-~® v~p ~ <br />