My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP25948
DRMS
>
Back File Migration
>
Report
>
REP25948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:57:21 PM
Creation date
11/27/2007 4:22:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Report
Doc Date
7/13/2001
Doc Name
Annual Report
From
American Soda LLP
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 EXECUTIVE SUMMARY -START OF ACTIVE OPERATIONS <br />The following Annual Report addresses American Soda's Yankee Gulch Sodium <br />Minerals Project, located in Rio Blanco County, Colorado. In accordance with <br />C.R.S. 34-32-116(3J(a), the Annual Report provides a summary of the surface <br />disturbance and reclamation performed during the current reporting period from <br />July 13, 2000 to July 12, 2001 (2000 - 2001), as well as planned disturbance <br />and reclamation for the next reporting period from July 13, 2001 -July 12, <br />2002 (2001 - 2002). Activities at the Yankee Gulch Project during the <br />reporting period were conducted under the regulatory guidance and inspection <br />oversight of the Colorado Division of Minerals and Geology (DMG] under Permit <br />No. M-99-002. <br />The 2000 - 2001 reporting period was highlighted by the start up of commercial <br />operations for the Yankee Gulch Project. Construction of the project was <br />completed in early October 2000. The start of active mining operations occurred <br />immediately thereafter on October 9, 2000. With start up, American Soda <br />began the solution mining process of circulating heated water through the well <br />field to extract nahcolite. Over the course of the reporting period since start up, <br />the nahcolite extraction rate has gradually increased as the solution mining <br />cavities have grown over time. American Soda began shipping finished soda ash <br />and sodium bicarbonate products from its Parachute Processing Operation in <br />late-November 2000. <br />As part of this Annual Report, American Soda has prepared maps identifying <br />areas where disturbance has occurred during the report period. Figure 1 <br />provides a general location map of the American Soda Piceance Site Mining <br />Operation. Figure 2 provides a detailed map of the Piceance Site Processing <br />Facility and its surroundings. Figure 3 provides a detailed map of the 0 - 5 year <br />mining panel, where the majority of surface disturbance has occurred to date. <br />Figure 3 also identifies American Soda's Pilot Plant Area, which was developed in <br />1997. <br />Section 2.0 of this report addresses permit modifications for the Yankee Gulch <br />Project during the 2000 - 2001 permit period. Section 3.0 addresses the <br />status of American Soda's project operations, including the extent of current <br />disturbances and additional disturbance planned for 2001 - 2002. Finally, <br />Section 4.0 describes reclamation that has occurred to date and is planned far <br />the 2001 - 2002 reporting period. <br />American Soda, L.L.P. ] <br />DMG Annual Report <br />July 13, 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.