Laserfiche WebLink
<br />M4R 3 ~ ~99~ <br />l)IV4SW0 FI l+nnklHlK h yPgI~QY <br />Fall 1996 (August 28, 1996 to September 6, 1996) Acres <br />Lower Refuse Pile (west-slope reclamation) 0.87 <br />(Topsoil Pile) 1.46 <br />(Subsoil Pile) 0.69 <br />Main Substation (east road slope) 0.46 <br />Breaker Building (east of parking lot/middle access road) 0.41 <br />MB-I Emergency Spillway Road 0.09 <br />South side Administration Parking Lot 0.28 <br />Sub-total 4.26 <br />Tota11996 Revegetated Acreage 8.26 <br />In addition to the revegetated areas, Mountain Coal Company installed erosion <br />control (silt fencing) and cattle fencing at the following locations: <br />Historic Records Study Area Cattle Fence 2900 lineal ft. <br />Lone Pine Gulch Sub-station Silt Fence SOO lineal ft. <br />Material S[orage Bench (cut slopes) Silt Fence 10001ineal ft. <br />Lower Refuse Pile Silt Fence 1000 lineal ft. <br /> 5400 lineal ft. <br />(c) Backfilling, Grading, and (d) Topsoiling <br />Lower Refuse Pile (west slope sub-soil and topsoil <br />redistribution) 2.50 ac. <br />Total Backfilling, Grading, and Topsoiling 2.50 ac. <br />(e) Hydroseeding or broadcast seeding with the approved permanent seed mix was <br />performed on all of the previously mentioned areas. <br />Mountain Coal Company's exploration reclamation plans for roads and pads are addressed in NOI <br />No. X-94-212-03 and subsequent Minor Revisions Nos. 183 and 187. <br />Please notify me if you have any questions regarding this reclamation report. <br />Sinc rel , <br />~` <br />eery A. arbe <br />Environmental Coordinator <br />xc: C. Johnston <br />K. Welt <br />File ADM-440.4 <br />anlrec96.doc <br />