Laserfiche WebLink
Based on our limited observations, it appears that the pile is currently being constructed and maintained in <br />general accordance with the project specifications and plans submitted under 2.05.3(8) and [hat the <br />potential hazazd to human life and property a[ the site in its present condition is minimal. This report <br />fulfills the quarterly inspection requirements as specified by Rules 4.09.1(11)(a), 4.09.1(11)(b), 4.10.2(2)(a) <br />and 4.10.2(2)(b). If you aJ~e any questions regazding this report or our observations, please contact this <br />office. <br />Sincerely, <br />Brian D. Ig ~.g~ 1131°~' <br />.~ <br />xc: Byron G. f8i~,~'}`Minera{s & Geology <br />Job Number: 99-3983 NWCC, Inc. Page 2 <br />