My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP25442
DRMS
>
Back File Migration
>
Report
>
REP25442
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:57:02 PM
Creation date
11/27/2007 4:13:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Report
Doc Date
3/25/1999
Doc Name
GOB PILE QUARTLERY REPORT PN C-81-022
From
OXBOW MINING INC
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~i <br />MINING /NC. <br />~nmrn CrM~ YIN <br /> <br />FIRST QUARTER 1999 <br />ENGINEERING INSPECTION <br />EAST YARD AND WEST VALLEY FILL <br />GOB DISPOSAL PILES <br />The Sanborn Creek Mine approved permit document includes the requirement to inspect the coal <br />mine waste pile for stability quarterly. The inspection is to be performed by a registered engineer or <br />other qualified professional specialist experienced in construction of earth and rockfill <br />embankments. Both Bear Coal Company and the Sanborn Creek Mine have approval to dispose of <br />coal mine waste in the gob pile. <br />On March 22, 1999, I performed a visual inspection of the East Yard and West Valley Fill gob <br />disposal areas at the Sanborn Creek Mine. The East Yazd gob disposal area was dry. Nothing was <br />observed during the inspection that would indicate the pile has a potential for failure. Safety berms <br />are required on the downhill edge of the pile by the Mine Safety and Health Administration. <br />Compaction tests were performed for fourth quarter 1993, second quarter 1994, fourth quarter 1994, <br />second quarter 1995, fourth quarter 1995, second quarter 1996, fourth quarter 1996, and third quarter <br />1997. Gob material has consistently passed compaction tests. Compaction tests are required, as <br />necessary, based on the amount of material added to the waste area. Compaction tests are planned as <br />material is added to the waste area <br />A considerable quantity of material has been removed from the East Yazd area for use as base <br />material for the new coal stockpile. Plans are to survey the pile on at least an annual basis for <br />accurate volume reports. Surveyor John Menke has not yet completed the survey calculations for the <br />volume of material removed Bear Coal Company did not haul any material to the gob pile during <br />the last five years. The Bear Mine was closed during December of 1996. Bear Coal Company may <br />haul material to the gob pile as part of the reclamation of the Bear Mine. <br />P O. Box 5 3 5 3 7 3 7 H i g h w a y 1 3 3 Somerset , C o i o r a tl o 8 1 4 3 4 U S A <br />TEL (9 7 0) 9 2 9- 5 1 2 2 FAX (9 7 0) 9 2 9 5 1 7 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.