Doc Name
2006 AHR Response to Review Letter
From
Twentymile Coal Company
To
DRMS
Annual Report Year
2006
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3) Clean-up of coal fines deposited in [he proximate portion of Foidel Creek. Environmental Staff constructed a <br />high pressure hose system with a 300 gallon tank. A small vacuum tanker track was hired to remove coal fine <br />material and dispose of it in a section of the refuse pile. The Pond E dischazge channel was cleaned using the <br />high pressure water system. Coal fines were washed off the banks of Foidel Creek and eventually driven into <br />small basin aeeas, where the vacuum truck and TCC Environmental personnel could remove the fines. Clogged <br />culverts were cleaned using the vacuum hose in conjunction with the high pressure water system. Final cleanup <br />was completed by mid-October 2006. <br />For additional detail, please refer to abatement communications for NOV CV-2006-006 <br />Constmction DewaterinQ Permit CO-G072272 <br />In July 2006, Twentymile Coal contacted Mr. Chris Gates of CDPHE regarding this site and later submitted a <br />Constmction Dewatering -Wastewater Dischazge Application, which was subsequently approved (Outfa11001A <br />under CO-G072272). Mr. Gales also requested preliminary analyses of [his water for alkalinity, COD, pH and <br />TDS. A sample was collected and analyzed for these parameters. A dischazge channel was constructed in late <br />July, and weekly monitoring of discharge from outfall OOIA began in August. Note that water was pumped from <br />the sedimentation pond through OOIA on an as needed/ sporadic basis. Pump flows were estimated. CDPHE <br />Discharge Monitoring Reports were copied to DRMS. <br />In summary, Outfall OOlA was recorded as flowing in July and for two weeks in August 2006. There was no <br />further flow in 2006. Two exceedances (30 day average and 7 day max) were obtained for total suspended solids <br />(TSS). The first sample in the month exhibited a value of 14 mg/1, while the second exhibited a value of 94 mg/I. <br />This may have resulted from the pump system agitating the water from the sedimentation pond during low water. <br />The system was examined and adjusted accordingly. Note that the site dischazged for a few days in the spring of <br />2007. No exceedances were noted, and there has been no further discharge to date. <br />3.8 2006 Inflow Survey <br />The annual inflow survey was performed during November. During the 2006 inflow study, flow rates and field <br />parameters were recorded for measurable inflows from the accessible areas of the underground mine. Results of <br />the 2006 survey are presented on Figure 117, 2006 Inflow Study Mined Area (in map pouch a[ back of report). <br />The WMD was closed in 1996 at that time inflows were 52 gpm. Note that water elevations for the WMD were <br />monitored periodically at the Fish Creek Borehole. Our best estimate is that inflows for the WMD aze still on the <br />order of 50 gpm. <br />Longwall mining was completed in the EMD by early-January 2001. Production from the NMD, 12 Rt Longwall <br />Panel, was underway by late January 2001. The EMD was permanently sealed in October 2001 removing all <br />access to the 6 Rt and 7 Rt gate roads. Thus, no measurements are available in this azea for 2006. Historical data <br />is available in previous AI-IRs. The last flows measured for 2000 showed seasonal variations, with an average <br />annual flow of approximately 65 gpm. The EMD was monitored periodically at the lORT well shaft during 2006. <br />Norther Mining District (NMD): At the time of the 2006 inflow study, the mine operation was nearing the end of <br />the 19 Rt panel. During 2006, the main sources of water came from the two most recent shafts in the 6MN area, <br />and two fault crossings. Total inflow is estimated to be on [he order of 90 gpm. Inflows continued in the <br />Northeast Submains, although there appeats to be a continued decrease in ceiling dripping. The highest inflows <br />14 <br />