My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP25350
DRMS
>
Back File Migration
>
Report
>
REP25350
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:58 PM
Creation date
11/27/2007 4:11:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
12/11/2001
Doc Name
1996 Annual Hydrology Report - text & surface water
Annual Report Year
1996
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Table 1.4-1 <br />Groundwater Monitoring Program at the West Elk Mine <br /> Water Levey <br /> e <br />Flo <br />~ <br />Station Fie d <br />Parameters Full Suite Analysis <br />Facility Arca Wells and Alluvial Wells' <br />GP-1 (MW-5) 3 times per year Annually' <br />GP-3 (MW8) 3 rimes per year Awually' <br />GP-0 (MW-9) 3 Cures per year Annually' <br />GP-5 (MW-3) 3 times per year Annually' <br />GB-I 3 times per year Amually' <br />Permit Area Wells Completed is the Barter Member Above the 'F' Seam <br />B-32 3 times per year Annually' <br />SOM-38-H-1 3 times per year Annually' <br />SOM-80 3 times per year Annually' <br />SOM-13 3 times per year Annually' <br />SW-1 3 limes per year Annually <br />SW-2 3 times per year Annually' <br />SW-3 3 times per ycar Annually' <br />• SW-0 3 times per year Annually' <br />SW-5 3 times per year Annually' <br />SW-6 3 canes per year Annually' <br />Study Area Wells Completed in the 'F" Seam <br />SOM-2-H 3 times per year Annually' <br />SOM-ICrH 3 times per year Annually' <br />Permit Area Well Completed N the 'E' Seam <br />SOM-23-H2 3 times per year Annually' <br />Permit Atea Wells Completed ¢t the 'B' Seam <br />C-72-H 3 times per year Annually' <br />SOM-l29-H 3 times per year Amually <br />3MB-12 3 times per year Annually' <br />Facility Arca Wells Completed N the Rollins Sandsmne just below the 'B' Seam <br />SOM-128-H 3 times per year Annually' <br />LP-1 3 times per year Annually' <br />' Fmm permit C-80-007, pages 2.04-48 and 2.04-49, last revised August 1994, TR-71 , Table 18, Water Quality Monitoring Pmgam. <br />' If waver is prcunt, samples will be obuined three times per year for laboratory analysis of TOS, Fe, and Mn. <br />' Amual analyses during the thud sampling period include laboratory analysis of pH, conductivity. temperature, coral dissolved solids (TDS). <br />calcium, magnesium, sodium, SAA, hardness, bicarbonate, chloride, tin-ionized arrtmonia, nitnre/ni[rite, phosphate (PO;' as P), sulfate, ima <br />(mm and dissolved), manganeu (mW and dissolved), arsenic, cadmium, lead, memory, selenium and zinc. All parameters were analyzed for <br />their dissolved form unless sn[ed otherwise. <br />1-0-I.IbIW HR-95.2!0 g <br />
The URL can be used to link to this page
Your browser does not support the video tag.