My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP25195
DRMS
>
Back File Migration
>
Report
>
REP25195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:52 PM
Creation date
11/27/2007 4:08:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987078
IBM Index Class Name
Report
Doc Date
6/12/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Permittee Name: <br />Permit No <br />Operation Name: <br />Anniversary Date: <br />Total: <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br /> <br /> <br />Notice of Intent to Continue Mining Operations <br />110c Construction Materials Annual Reoort <br />Rec; y 5`l~ l~~S' <br />RECEIVEd <br />City of Lamar JUN 12 19gg <br />M-87-078 <br />Lamar Park Grav Pi t DiviSbn Of MfneralS 6 GBOb9Y <br />June 29, 1998 <br />$225.00 (Due on your Anniversary Date) <br />C oritract Dates: Ifor 111 permits only) Beginning date: <br />Completion date: <br />a. Permitted acreage: 9.932 b. county where mine is located: <br />Has this mine been granted TEMPORARY CESSATION STATUS? <br />DOES this mine operate MORE or LESS than 180 days per year? <br />Does this mine have a phased reclamation plan? <br />Total acres affected during the report year:* <br />Total acres reclaimed fox the report year:* <br />Total number of acres in topsoil replacement stage: <br />a. Average thickness of copsoil replaced: <br />Total number of acres seeded: <br />a. List species seeded s seeding rate for report year on back <br />The type and approximate quantity of fertilizers <br />conditioners used for the report year:* <br />11. Estimated total acres to be affected in the next report year:' ~•5 <br />lz, cornaENTS: Quantity of gravel being approximately 175 tons <br />w,ss removed from the stockpile area. Additional mining was <br />n~Dt performed for the report year. <br />Please show the location of the acreage for items 4 - 6 on your map*'. Indicate the <br />phases of the reclamation which have been completed, correlated with your timetable. <br />** NOTB: _f there have not been any changes since the last annual reporC and you <br />previously submitted a map which correctly depicts the current acreaye in iCeu~s 2 ti,rc:.gh <br />6, then a new map is unnecessary. However, this must be stated above. <br />Signature: `~~/C2~"'[^'~~l? /~~~~ Date: 05~26~98 <br />Please CypE~ or print current contact name, mailing address, and phone number below: <br />contact rlaa.e: Patrick Mason <br />Company: <br />Address: <br />City of Lamar <br />102 E. Parmenter <br />Lamar, Co. 81052-3299 <br />Prowers <br />YES NO <br />MORE LESS <br />YES NO <br />O . 5 <br />0 <br />organic material or soil <br />Phone: ( 719) 336-4495 <br />FAx No: (719) 336-4404 <br />Federal Tax ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.