Laserfiche WebLink
Introduction: <br />In compliance with Rule 2.04.13, Bowie Resources Limited (BRL), Permit No. C-81-038, <br />submits the following Reclamation Report for the calendar year 2006. <br />2006 Reclamation Activies: <br />Bowie Resources LLC began a partial reclamation of the Bowie No. 1 Mine Loadout <br />facilities. This partial reclamation project consisted of demolition of the following structures: <br />3 Concrete Silo's <br />Truck Loadout <br />Truck MCC Building <br />Dust collection system <br />Truck Dump to Silo belt structure <br />Silo to loadout belt structure <br />Silo MCC building <br />Train loadout facilities <br />Train loadout MCC building <br />Approximately 1,200 feet of track <br />2005 Reclamation Activities: <br />During the reporting year of 2005, Bowie Resources continued with the reclamation of <br />the Bowie #1 West Mine Ventilation shaft site. Reclamation consisted of distributing and <br />grading of topsoil back to its approximate original contour over shaft site. Upon completion of <br />the grading, the entire area was seeded with the approved permanent seed mix and covered with <br />straw mats. <br />There were also drill hole sites on the Bowie #1 permit area that were reclaimed in 2005. <br />2004 Reclamation Activities: <br />There were no reclamation activities during this reporting period. <br />2003 Reclamation Activities: <br />During the reporting period of 2003, Bowie Resources completed sealing the Bowie 1 <br />West Mine ventilation shaft. A 12-inch concrete cap with steel reinforcement, extending 2 feet <br />beyond the shaft liner was completed in September of this year. This included one 4-inch vent <br />pipe as required and backfilling. The following photographs are of the shaft sealing project. <br />