Laserfiche WebLink
/~ Kennecorr III Illllllllllll 111 <br />/~ . Energy r_ , Memorandum <br />Coloayo Cool Company L,P '~ <br />FOR: Jim Kiger April 20, 1998 <br />West Pit Fill Construction Report <br />During the quarter beginning January 1, 1998 and ending March 31, 1998, <br />I inspected the area in which the West Pit Excess Spoil Fill is being <br />constructed. The purpose of these inspections was to inspect the fill surface <br />for vegetative efforts; inspect the fill for areas of water seepage or surface <br />drainage and to satisfy the requirements of CDMG. Rule 4.09.1 (lla). <br />During the quarter no activity took place on the fill slope. All <br />dumping from the West Pit Mining Activity was dumped above previously mined <br />areas within the fill perimeter during the quarter. Some drainage type <br />material was hauled to the top of the dump for incorporation into the surface <br />drain when weather permits, but no work was done on the fill during the <br />quarter. <br />Attached to this report are my certification that all construction <br />requirements have been met thus far in constructing the west Pit Excess Fill. <br />~- ~~ <br />Stephen R. Hinkemeyer <br />Engineering Manager <br />cc. West Pit Fill Construction Engineering Report <br />