Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />Permittee Name: <br />Permit No. . <br />Operation Name: <br />Anniversary Date: <br />Total: <br />Re c: 11 l,~ <br />. ~~`~ 11.20 <br />Notice of Intent to Continue Mining Operati <br />112c Construction Materials Annual Reoorc <br />Meeker Sand and Gravel, Inc <br />M-76-038 <br />Meeker Pit <br />July 25, 1998 <br />$550.00 (Due on your Anniversary <br />RECEIVED <br />JUL 2 0 ~ <br />DIV. OF MINERALS <br />1. a. Permitted acreage: 78.8 b. County where mine is located: <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? <br />Does this mine operate MORE or LESS than 180 days per year? <br />3. Does this mine have a phased reclamation plan? <br />4. Total acres affected during the report year:' <br />5. Total acres reclaimed for the report year:' <br />6. Total number of acres in topsoil replacement stage: <br />a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: <br />a. List species seeded s seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: <br />Rio Blanco <br />YES NO <br />MOR LESS <br />YES NO <br />2 <br />0 <br />0 <br />0 <br />0 <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:` <br />10. Estimated total acres to be affected in the next report year:' <br />11. coru~ENTS: We are stripping topsoil further from active mining areas and <br />stockpiling it according to our topsoil management plan. <br />* Please show the location of the acreage for items 9 - 6 on your map ". Indicate <br />the phases of the reclamation which have been completed, correlated with your timetable. <br />For phased operations show dates extraction ceased and dates reclamation began. <br />•* NOTE: If there have not been any changes since [he last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 through <br />6, then a new map is unnecessary. However, this must be stated above. <br />Signature: i <br />Please t or print current contact name, <br />contact Name: Joe P. Conrado <br />Company: <br />Address: <br />Date: 7/15/98 <br />mailing address, and phone number below: <br />Phone: 1970 ~ 878-3671 <br />FAx No: 1970 ~ 878-5751 <br />Meeker Sand & Gravel, Inc. <br />P. 0. Box 1550 <br />Meeker, CO 81641 <br />Federal Tax ID No. or Social Security No.: <br />