My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP25125
DRMS
>
Back File Migration
>
Report
>
REP25125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:50 PM
Creation date
11/27/2007 4:08:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Report
Doc Date
11/16/1994
Doc Name
1994 ANNUAL RECLAMATION REPORT
From
SOMERSET MINING CO
To
DMG
Permit Index Doc Type
ANNUAL RECLAMATION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SOMERSET MINING COMPANY <br />SANBORN CREEK AND SOMERSET MINES <br />2.04.13 1994 Annual Reclamation Report <br />(2)fa) Acres Approved for Disturbance: <br />Area Acres <br />Total Previously Disturbed 69.3 <br />Elk Creek Coal Stockpile 2.3 <br />East Yard Reclaim 0.2 <br />Total Acres <br />71.8 <br />Page 2 <br />Elk Creek Coal Stockpile will be constructed if coal <br />production and market conditions require additional <br />coal stockpile area. Somerset is able to handle the <br />current conditions with the existing East Yard Coal <br />Stockpile. <br />East 1'a rd Reclaim and its associated relocation of the <br />East Yard access road will be constructed as resources <br />and scheduling are available. <br />(b) Other Reclamation Activities: <br />As a result of an OSM oversight inspection May 12, <br />1994, the variance to approximate original contour for <br />the Bear Creek portal location was considered to be not <br />in compliance with the approved Colorado program by <br />OSM. Under threat of enforcement action by OSM if <br />reclamation operations were initiated without <br />addressing these concerns, Somerset Mining Company <br />submitted Minor Revision No. 29 to delay the required <br />1994 reclamation at the Bear Creek and Lower Hubbard <br />sites until the issue was resolved between OSM and DMG. <br />Minor Revision No. 29 was modified during review to <br />delay the backfilling and grading requirements, but <br />still required completion of facility demolition. <br />Minor Revision No. 29 was approved on September 23, <br />1994. OSM issued a Ten-Day-Notice to DMG on September <br />29, 1994 for failure to reclaim a mine site to <br />approximate original contour and failure to properly <br />address the requirements for an approximate original <br />contour variance. DMG responded to the TDN by <br />requiring submittal of a technical revision by November <br />14, 1994 demonstrating that all available spoil will be <br />utilized in reclaming the Bear Creek portal area. <br />During 1994, removal <br />Creek portal area <br />foundations within <br />demolished by blastin <br />Hubbard sites, and the <br />Hubbard site. <br />of the substation at the Bear <br />was completed, the concrete <br />the excavation limits were <br />~ at the Bear Creek and Lower <br />fence was removed from the Upper <br />
The URL can be used to link to this page
Your browser does not support the video tag.