Laserfiche WebLink
f_ J <br />`J <br />Mined Land Reclamation <br />TABLE I CONT'D <br />STATION Ull <br />8 March 17, 1992 <br />August, 1985 Not tied in this Survey <br />July, 1986 401,405.76 1,440,865.24 7335.14 <br />November, 1986 401,407.06 1,440,865.20 7334.60 2 <br />July, 1987 401,405.85 1,440,865.20 7335.21 <br />October, 1987 401,405.81 1,440,865.28 7335.14 <br />June, 1988 401,405.91 1,440,865.46 7335.04 <br />November, 1988 401,405.93 1,440,865.31 7334.95 <br />July, 1989 401,405.97 1,440,865.36 7334.85 <br />November, 1989 401,405.97 1,440,865.37 7334.70 <br />July, 1990 401,406.04 1,440,865.64 7334.63 <br />November, 1990 401,406.10 1,440,865.34 7334.58 <br />July, 1991 401,406.28 1,440,865.30 7334.48 <br />November, 1991 401,406.53 1,440,864.91 7334.36 <br />Mean 401,406.01 1,440,865.32 7334.83 3 <br />Slope Stability Stations at Bear #3 Are Tied to D-11-U and D-12-U <br />through a series of primary loops: <br />Bear #3 U 16 <br />U 17 <br />U 18 <br />U 19 4 <br />U 23 5 <br /> <br />Table 2 is a list of slope stability Stations with their coor- <br />dinates and elevations from August, 1985, through November, 1991 <br />and the resulting mean values. <br />2Tied by triangulation-No distances <br />3Mean does not include November, 1986 <br />4Monument = ~5 Rebar <br />SMonument = '~7 Rebar in concrete <br />