f_ J
<br />`J
<br />Mined Land Reclamation
<br />TABLE I CONT'D
<br />STATION Ull
<br />8 March 17, 1992
<br />August, 1985 Not tied in this Survey
<br />July, 1986 401,405.76 1,440,865.24 7335.14
<br />November, 1986 401,407.06 1,440,865.20 7334.60 2
<br />July, 1987 401,405.85 1,440,865.20 7335.21
<br />October, 1987 401,405.81 1,440,865.28 7335.14
<br />June, 1988 401,405.91 1,440,865.46 7335.04
<br />November, 1988 401,405.93 1,440,865.31 7334.95
<br />July, 1989 401,405.97 1,440,865.36 7334.85
<br />November, 1989 401,405.97 1,440,865.37 7334.70
<br />July, 1990 401,406.04 1,440,865.64 7334.63
<br />November, 1990 401,406.10 1,440,865.34 7334.58
<br />July, 1991 401,406.28 1,440,865.30 7334.48
<br />November, 1991 401,406.53 1,440,864.91 7334.36
<br />Mean 401,406.01 1,440,865.32 7334.83 3
<br />Slope Stability Stations at Bear #3 Are Tied to D-11-U and D-12-U
<br />through a series of primary loops:
<br />Bear #3 U 16
<br />U 17
<br />U 18
<br />U 19 4
<br />U 23 5
<br />
<br />Table 2 is a list of slope stability Stations with their coor-
<br />dinates and elevations from August, 1985, through November, 1991
<br />and the resulting mean values.
<br />2Tied by triangulation-No distances
<br />3Mean does not include November, 1986
<br />4Monument = ~5 Rebar
<br />SMonument = '~7 Rebar in concrete
<br />
|