Laserfiche WebLink
., <br /> <br />There are 12.9 acres in the topsoil replacement stage. See the table in <br />response number 5. Also, refer to the map submitted last year. <br />6a. Average thickness of topsoil replaced. <br />The average thickness of topsoil replaced to date has been 12 inches. <br />7. Location and number of acres seeded. <br />There are 12.9 acres in the seeded stage. See the table in response <br />number 5. Also, refer to the map submitted last year. <br />7a. The species of vegetation planted, the seeding rates and approximate <br />dates of planting. <br />No planting was done during the report year. <br />9. The type and approximate quantity of fertilizer, organic material or <br />soil conditioner used and location of use. <br />GF.SDnNCF.; <br />No fertilizer, organic material or soil conditioner was used during the <br />report year. <br />10. Estimates of the location and number of acres to be affected in the next <br />report year. <br />RF. C~ONCF. ; <br />Exhibit D-1, Mining Plan, contained in Permit 82-036, shows the <br />anticipated direction and extent of mining. At the present time, mining <br />has advanced ae far ae permitted. In May 1998, Seneca submitted to the <br />Division a technical revision to the permit so that mining activities <br />can progress further to the west. Therefore, the anticipated disturbance <br />for 1998-1999 is: <br />2 <br />