My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP24961
DRMS
>
Back File Migration
>
Report
>
REP24961
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:44 PM
Creation date
11/27/2007 4:06:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988090
IBM Index Class Name
Report
Doc Date
3/9/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />V~ ---~ ~-.~J <br />iil ~iiiii~iiriii iii <br />Notice of Intent to ..999 ___ Wing Operations <br />112c Construction Materials Annual Report <br />Permit No. <br />Operation Name; <br />Anniversary Date: <br />Annual Fees for the Year(s): <br />Total: <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10 <br />11 <br />a. Permitted acreage: <br />M-8s-090 <br />jzec. Zy6~ <br />Gr`. ]zz ~ <br />RECEIVED <br />MAR 0 9 1996 <br />DeeF Trail Pit Division of Minerals 8 Geology <br />December 07, 1996 <br />1995 - 1996 <br />$55G~0.00 (Due on your Anniversary Date) / <br />/' /~S ~ b. County where mine is located: /~ `~ °~ <br />Hae this mine been granted TEMPORARY CESSATION STATUS? <br />Does this mine operate MO12E or LESS than 180 days per year? <br />Does this mine have a phased reclamation plan? <br />Total acres affected during the report year:+ <br />Total acres reclaimed for the report year:* <br />Total number of acres in topsoil replacement stage: <br />a. Average thickness of topsoil replaced: <br />YES ~~ <br />ORE LESS <br />YES NO <br />~~?? C~(S <br />7i / S - <br />~i 5~ <br />/ !i <br />Total number of acres seeded: W.~ -sa ~ 17 M~ ~ ~~-~- <br />a. List species seeded & seeding rate for report year on back /9S~f <br />For non-phased operations provide dates extraction ceased: /Y~~ <br />a. Date reclamation began: 1~..~..fd4~ 1°pSe~ <br />The type and approximate quantity of fertilizers, organic material or soil i9f7 <br />conditioners used for the report year:* ~~ ~, S~N4~..-,1- Ssz.-_f l ~ ~~ <br />Estimated total acres to be affected in the next report year:* 9r !"S <br />COMMENTS: <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTS: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />signature: .H._.~ Date: 5 - J S?~ <br />Please type or print c rrent contact name, mailing address, and phone number below: <br />Contact Name: ~CuI~( tKTc~~b),Coc Phone: (.~63) ~'t1/~y9~ <br />. _ T ~ .FAX NO: (~oj ) C~-1 L 7rs_S-3 <br />Company: ~ G~ /'{ 7. h l oy ~L, lS °S <br />Address: ~ `t'-d`/ <br />4s n,~co go~o3 <br />Federal Tax ID No. or Social Security No.: D ~- / /~ ~~65 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.