My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP24947
DRMS
>
Back File Migration
>
Report
>
REP24947
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:43 PM
Creation date
11/27/2007 4:06:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981307
IBM Index Class Name
Report
Doc Date
7/7/2006
Doc Name
Annual Report
From
Lafarge West Inc
To
DMG
Permit Index Doc Type
Annual Reclamation Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Notice of Intent to Continue Mining Operations <br />112c Construction Materials Annual Report <br />Permittee Name: Lafarge West, Inc. <br />Permit No: M-1981-307 <br />Operation Name: Fountain Pit 603 <br />Anniversary Date: June 15, 2006 <br />Total: $688.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: 605.8 b. County where mine is located: El Paso <br />2. Has this mine been granted TEMFORARY CESSATION STATUS? No <br />Does this mine operate MORE or LESS than 180 days per year? More <br />3. Does this mine have a phased reclamation plan? Yes <br />9. Total acres affected during the report year:* +/-25 <br />5. Total acres reclaimed for the report year:* +/-10 <br />6. Total number of acres in topsoil replacement stage: 0 <br />a. Average thickness of topsoil replaced +/-6" <br />7. Total number of acres seeded: 0 <br />a. List species seeded and seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: NA <br />a. Date reclamation began: NA <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* None <br />10. Estimated total acres to be affected in the next report year:* +/-20 <br />11. COMMENTS : See attached map. Reclamation work Currently Starting for 2006. <br />* Please show the location of the acreage for items 4-6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />*` NOTE Z£ there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: ( RA(` ~ P~r~Q y~~~~ I-~~ Date 7/7/2006 <br />---r--- <br />Please type or print current contact name, mailing address, and phone number below: <br />contact Name: Eric Reckentine Phone: 303-657- <br />FAx No: 303-657- <br />company: Lafarge West, Inc. <br />Address: ~OITpt_y1191Y`5~ 1~.nr~~1r, ~~y ~aClp <br />l J~rni•n~ir>,T_gfX~~ 1 <br />Federal Tax ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.