My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP24901
DRMS
>
Back File Migration
>
Report
>
REP24901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:42 PM
Creation date
11/27/2007 4:05:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Report
Doc Date
4/21/2000
Doc Name
CONSTRUCTION REPORT FOR STORM WATER POND QUALITY ASSURANCE MANUAL FOR THE INSTALLATION OF FLEXIBLE M
From
AMERICAN SODA
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> <br />1,1 Terms of Reference <br />1.1.1 Purpose <br />This manual addresses the quality assurance and quality control of the installation of flexible <br />membrane liners used by Colorado Uning international (CLI) in hazardous waste disposal landfills, <br />surface impoundments or other inslailations as speafied by the owner and/or engineer. This manual <br />therefore delineates the quality procedures and standards for production and installation. <br />' This manual reflects the requirements of the Hazardous and Solid Waste Amendments of 1984 to <br /> the Resource Conservation and Recovery Ad (RCRA), and 'Construction Quality Assurance for <br /> Hazardous Waste Land Disposal Fadlities, Public Comment DrafC, Document EPA/530SW-86-031, <br /> July, 1986. <br /> r <br /> 1.1.2 Quality Assurance and Quality Control <br />' In the context of this manual, quality assurance and quality control are defined as follows: <br /> quality Assurance - A planned and systematic pattern of all means and actions designed to provide <br />' adequate confidence that items or services meet contractual and regulatory requirements and will <br /> perform satisfactorily in service. <br />' Quality Control -Those actions which provide a means to measure and regulate the characteristics <br />of an item or service to contractual and regulatory requirements. <br />In the context of liner production and installation: <br />Quality Assurance refers W means and actions employed by CU to assure conformity of the lining <br />system production and installation with the quality Assurance PWn and speaficetions. <br />quality control refers to those actions taken by the Manufacturer, Fabricator and Installer to ensure <br />that the materials and the workmanship meet the requirements of the plans and specifications. <br />' 1.13 Lining Materials <br />For purposes of this document, the 6errrr "geomembrane' is applied to flexible membrane liners. <br />' More specifically 'geomembrane' refers to polyethylene geomembranes, with either smooth surface <br />or textured surface for increased friction. These geortrembranes include high density polyethylene <br />(HDP~ membranes which are made from resins with a specific gravity greater than 0.935. <br />' The quality assurance o(a geosynthetic liner system is addressed herein in its entirety, inGuding all <br />stages from manufactiire m installation. <br />1 <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.