My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP24901
DRMS
>
Back File Migration
>
Report
>
REP24901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:42 PM
Creation date
11/27/2007 4:05:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Report
Doc Date
4/21/2000
Doc Name
CONSTRUCTION REPORT FOR STORM WATER POND QUALITY ASSURANCE MANUAL FOR THE INSTALLATION OF FLEXIBLE M
From
AMERICAN SODA
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' I`/. Actual Seaming Process <br /> A. FML material to be extrusion welded must have surface oxidation removed by lightly <br /> grinding the weld surface with a 60 or 80 grit disc. The grinding is performed parallel to the <br /> seam and controlled such that grinding marks do not extend more than 0.25 inches outside <br />' the area of the weld bead. Grinding should precede the ardual welding as Gosely as <br /> _ possible but in no case should grinding precede welding by more than one hour. Sbcty mil or <br /> thk~cer liners should have the edge of the top sheet beveled by grinding to approximatey a <br /> 45o angle. <br />' B. The FML to be extrusion welded must be temporarily bonded to hold the material in place <br />until the extrusion weld bead cools and attains full strength. This is normally accomplished <br /> by performing an automatic or hand hot air tack weld. <br /> C. The extrusion welder stwuld be purged of all degraded plastics prior to the start of seaming. <br /> D. The welding operation should be observed >b assure the weld bead is centered over the <br />' edge of the top FML sheet and that weld bead appearance is smooth and unifomr. <br /> E. All extrusion welds shoukf be non-destructively tested by vacuum testing as described in the <br /> QC Manual. Areas which cannot be non~Jestructively tested should be visually inspected. <br />' <br /> F. Destructive tests can be conducted when seam lengths are adequate. <br />1 <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br />23 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.