Laserfiche WebLink
Robinson Brick Company is filing this Annual Report providing a Notice of Intent to <br />Continue Mining Operations at Buffalo Mine located in Elbert County, Colorado. The <br />mine has a phased reclamation plan. <br />Operations (Current Year) <br />Mining operations continue in accordance with the mine plan. The permitted acreage <br />remains at 354.5 acres and the maximum allowable disturbed acreage remains at 30 <br />acres. Current disturbance is approximately 8.6 acres in Phase III. No additional acres <br />were disturbed this period. No additional acres were reclaimed during this reporting <br />period. <br />Operations (Next Year) <br />Mining operations in 2006-2007 will disturb no additional acres. <br />Bonding <br />Deemed adequate at this time. <br />