My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP24769
DRMS
>
Back File Migration
>
Report
>
REP24769
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:37 PM
Creation date
11/27/2007 4:03:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
12/13/1993
Doc Name
BATTLE MOUNTAIN RESOURCES INC BMRI SAN LUIS PN M-88-112 TAILINGS AREA CONST ACTIVITIES WK NOV22 1993
From
BATTLE MOUNTAIN RESOURCES INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />iii iiniiiiiiiiiiii , <br />BATTLE MOUNTAIN RESOURCES, INC. <br />November 22, 1993 <br />Mr. Larry Oehler <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 . <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, <br />DMG Permit No. M-88-112 <br />Tailings Area Construction <br />Week of November 22, 1993 <br />Dear Mr. Oehler: <br />'. ~, ~~19,'; <br />Inc. (BMRI) - <br />Activities <br />1 I' <br />, ` F. S r ~ r <br />~ II i~/ <br />~~~ . <br />1~ `~ iiLE MOUNTAIN <br />p'~~ IX6COMPANY j ~ , <br />L 11 V <br />n ~ <br />San~~Luris G~-l i ~ `l <br />// 1Z <br />During the week of November 15, 1993, construction <br />activities were limited to placement of liner cover .material <br />along the north side of the facility, stockpiling of liner <br />cover material in the borrow pit. Construction of the main <br />embankment was resumed on November 18. Doug Gibbs of water, <br />waste, and Land (WWL) has been on-site since November 18. <br />On November 15, piezometers 6-10 installed along the 8590' <br />Phase I embankment crest were checked and found to ble dry. <br />These piezometers were checked daily from September 29- <br />October 8 and are currently being checked on a monthly basis <br />as required by the Division. Settlement marker information <br />is enclosed. The markers were not surveyed on November 13. <br />The following is a summary of construction activities for <br />the week of November 22, 1993: <br />-Continue stockpiling and placement of liner cover material <br />on the north side of the facility. <br />-Continue construction activities for the main emban4~ment. <br />BMRI has not received inspection reports from the Di ision's <br />site visits on October 7 and October 28. BMRI reque is that <br />these reports be immediately issued so that any conc rns <br />noted by the Division can be quickly resolved. Once again, <br />as a means of maintaining effective and efficient li es of <br />communication, we request that inspection reports be <br />completed and issued while the Division is on-site. <br />Sincerely, <br />~~aa s~t- <br />Alana L. Scott <br />Environmental Engineer <br />cc: Clint Strachan <br />Anne Baldrige <br />Ken Kluksdahl <br />Mike Young <br />A SUBSIDIARY OF BA7TLF M1IOUNTdIN COLD COM1IPAh'Y <br />P.O. BOS 31U SAN LUIS, COLORADO &1152-0710 171916]_-376'_ FAX p191 67 2-336 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.