Laserfiche WebLink
;~ <br />January O8, 1999 <br />999 <br /> <br />Ja~d 1 ' 1999 <br />Oiyision „~ <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />January 03,[/1'999 - January 09, <br />Dear Mr. Dillie: ~- <br />Geology <br />- San Luis Project <br />1999 <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of January 03, <br />1999 - January 09, 1999 as required by the approved TR-010. <br />During the week, the tailings pond averaged <0.010 ppm CN-wad and 0.156 <br />ppm CN-total. The collection pond averaged <0.010 ppm CN-wad and <0.010 <br />ppm CN-total. <br />Si e~r);e~lyV <br />Inl~~/~ <br />Ju io F. Madrid <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />