My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP24584
DRMS
>
Back File Migration
>
Report
>
REP24584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:30 PM
Creation date
11/27/2007 4:01:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Report
Doc Date
3/21/2007
Doc Name
4th Quarter 2006 Quarterly Wastebank Inspection
From
Peak Project Management, LLC
To
DRMs
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~O <br />~~G~~ ,~pp1,,,~ <br />~~1 dc~a`;~N , <br />O~~~s~~~\~9a <br />New EIk Mine <br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />Mine: NEW ELK <br />Waste Bank MSHA ID. No.: <br />Inspection Period: <br />Inspection Date: <br />CDMR Rules 4.09.1(11) and 4.10.2(2) <br />R~~ <br />General Description or Reference to Site Plan: <br />The Refuse Disposal Area is located north of State Highway 12 and the Middle Fork of the <br />Purgatoire River. Refuse was transported from the preparation plant to the RDA by conveyor belt. <br />The plant has been idle since March of 1996 at which time the last refuse was placed on the <br />fill area. <br />Activity During Inspection: <br />Area was idle througout the quarter. No activity occurred during the inspection. Location was <br />snow covered and accessible with cross country skis. Snow exceeded two foot in depth in <br />most areas. <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdrain construction ands <br />or discharge, integrity of 100-year 24-hour drainage structures, and evidence of positive drainage). <br />No springs or seeps were observed on the refuse side slopes. Winter conditions prevailed <br />throughout the area. <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, . , <br />and construction methods). <br />Previously placed fill material has been regraded to promote managed drainage from the extensive <br />surface area (approximately 20 acres). Reworked material was placed in no greater than two foot <br />lifts and compacted with a D-8 dozer during placement. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.