Laserfiche WebLink
KEENESBURG ASHDATA <br /> Standby Ash <br />Date Driver 894 895 Trailer Time Loads Tons Comments SB Pit NB Pit WA Pit Total Tons <br />6/16/97 J Snider 440 0 112 0.0 4 98.0 Switch front tires 108,675 5,667 203,434 317,776 <br />O <br />i <br />6/16/97 D. Snider 0 440 114 0.0 4 98.0 Cvr ash 311; wtr 600, 25% It 108,675 5,667 203,532 317,87a <br />6/17/97 Jesser 331 0 112 0.3 3 73.5 Delay - Baghouse work 108,675 5,667 203,606 317,948 <br />6117/97 Cordes 0 440 114 0.8 4 98.0 Delay-acid truck 108,675 5,667 203,704 316,046 <br />6/18/97 Jesser 330 0 112 0.0 3 73.5 108,675 5,667 203,777 318,119 <br />6/18!97 Cordes 0 440 114 0 0 4 98.0 Cvr ash 311; wtr 600; 25% It 108,675 5,667 203,875 318,217 <br />6119/97 D. Snider 0 440 114 0 0 4 98 0 Wtr 600; 25°h It 108,675 5,667 203,973 318,315 <br />6/19/97 J. Snider 440 0 112 0.0 4 98.0 Slope dirt 233 108,675 5,667 204,071 318.413 <br />6/20/97 D Snider 0 549 114 0.0 5 122.5 25%It 106.675 5,667 204,194 318,536 <br />6/20/97 J. Snider 549 0 112 0 0 5 122.5 Cvr ash 311; wtr 600 108,675 5,667 204,316 318,658 <br />6/21/97 J. Snider 440 0 112 0.0 4 98.0 Empty silo; flyash bin has 93T 108,675 5,667 204,414 318,756 <br />6/21/97 Cordes 0 331 114 0.0 3 73.5 Wsh 895 8 114 108,675 5,667 204,488 318,830 <br />6/22/97 D. Snider 440 0 112 0.0 4 98.0 Cvr ash 311; wtr 600; 25% It 108,675 5,667 204,586 318,928 <br />6/22/97 Cordes 0 440 114 0.0 4 98.0 Silo empty 108,675 5,667 204,684 319,026 <br />6/23/97 Jesser 330 0 112 0.0 3 73.5 Wsh 894 108,675 5,667 204,757 319.099 <br />6/23/97 Cordes 0 440 114 0.0 4 98.0 108,675 5,667 204,855 319,197 <br />6/24/97 Jesser 329 0 112 0 0 3 73.5 108,675 5,667 204,929 319.271 <br />6/2a/97 Cordes 0 440 114 0.0 4 98.0 108,675 5,667 205,027 319,369 <br />6/24/97 D. Snider 0 220 114 0.0 2 49.0 Cvr ash 311; wtr 600 108,675 5,667 205,076 319,418 <br />6/24/97 J. Snider 332 0 112 0.0 3 73.5 108,675 5,667 205,149 319.491 <br />6/25/97 J. Snider 440 0 112 0 0 4 98.0 Grs 894 8 112; fix tarp 112 108,675 5,667 205,247 319,589 <br />6/25/97 D. Snider 0 440 114 0.0 4 98 0 25% It 108,675 5,667 205,345 319,687 <br />6/26/97 D. Snider 441 0 112 0.0 4 96.0 Cvr ash 311; wtr 600 108,675 5,667 205,443 319,785 <br />6/26/97 Cordes 0 550 114 1 0 5 122.5 Delay -ash unloader problems 108,675 5,667 205,566 319,906 <br />6/27/97 J Snider 440 0 112 0.0 4 98.0 Cvr ash 108,675 5,667 205,664 320,006 <br />6/27/97 Cordes 0 550 114 0.0 5 122.5 25°r61t 108,675 5,667 205,786 320,128 <br />6/28/97 D Snider 0 330 114 0.0 3 73.5 25°,61t 108,675 5,667 205,860 320,202 <br />6/26/97 J Snider 330 0 112 0.0 3 73 5 Cvr ash & blade road 311 108,675 5,667 205,933 320.275 <br />6/28/97 Cordes 0 146 115 0.0 1 24.5 Cvr ash 311; wtr 600, 25°~ It 108,675 5,667 205,958 320,300 <br />6/29/97 J. Snider 551 0 112 0.0 5 122.5 Cvr ash 311 108,675 5,667 206,080 320,422 <br />6/29/97 D. Snider 0 331 115 0.0 3 73.5 Fix hub 115 (4.5 hr) 108,675 5,667 206,154 320.496 <br />6/30/97 D. Snider 0 550 115 0.0 5 122.5 Cvr ash 311; wtr 600', 25% It 108,675 5,667 206,276 320,618 <br />6/30/97 J. Snider 550 0 112 0.0 5 122.5 Change flat 108,675 5,667 206,399 320,741 <br /> 14,088 13,040 2.0 246 6027.0 <br />