My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP24538
DRMS
>
Back File Migration
>
Report
>
REP24538
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:28 PM
Creation date
11/27/2007 4:00:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977170
IBM Index Class Name
Report
Doc Date
10/27/1997
Doc Name
BUTALA GRAVEL PIT PN M-77-170 RECEIPT OF 112 CONSTRUCTION MATERIALS RECLAMATION PERMIT AMENDMENT APP
From
DMG
To
BUTALA CONSTRUCTION CO
Permit Index Doc Type
ANNUAL FEE/REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Frank Butala, Butala Construction Company <br />Regular 1 12 Construction Materials Amendment -Incomplete <br />Page 3 <br />(a) A description of the type(s) of reclamation you propose to achieve in the reclamation <br />of the affected land, why each was chosen, the amount of acreage accorded to each, and a general <br />discussion of methods of reclamation as related to the mechanics of earthmoving; <br />(b) A comparison of the proposed post-mining land use to other land uses in the vicinity <br />and to adopted state and local land use plans and programs. In those instances where the post-mining <br />land use is for industrial, residential, or commercial purposes and such use is not reasonably assured, <br />a plan for revegetation shall be submitted. Appropriate evidence supporting such reasonable assurance <br />shall be submitted; <br />(c) A description of how the Reclamation Plan will be implemented to meet each <br />applicable requirement of Section 3.1; <br />(d) Where applicable, plans for topsoil segregation, preservation, and replacement; for <br />stabilization, compaction, and grading of spoil; and for revegetation. The revegetation plan shall <br />contain a list of the preferred species of grass, legumes, forbs, shrubs or trees to be planted, the method <br />and rates of seeding and planting, the estimated availability of viable seeds in sufficient quantities of <br />the species proposed to be used, and the proposed time of seeding and planting; <br />(e) A plan or schedule indicating how and when reclamation will be implemented. Such <br />plan or schedule shall not be tied to any specific date but shall be tied to implementation or completion <br />of different stages of the mining operation as described in Subparagraph 6.4.4(1)(e). The plan or <br />schedule shall include: <br />(i) An estimate of the periods of time which will be required for the various stages <br />or phases of reclamation; <br />(ii) A description of the size and location of each azea to be reclaimed during each <br />phase; and <br />carried out. <br />(iii) An outline of the sequence in which each stage or phase of reclamation will be <br />(The schedule need not be separate and distinct from the Reclamation Plan, but may be incorporated <br />therein.) <br />(f) A description of each of the following: <br />(i) Final grading -specify maximum anticipated slope gradient or expected ranges <br />thereof; <br />and planting; <br />(ii) Seeding -specify types, mixtures, quantities, and expected time(s) of seeding <br />
The URL can be used to link to this page
Your browser does not support the video tag.