Laserfiche WebLink
<br /> S ~~ ~ ~~ ~~~ ~~~ ~~~~ ~ ~ ~~ <br /> <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Dcpanmem of Natural Resources <br />1 411 Sherman Si.. Ruom :15 <br />Denver, Culorarln B@OJ <br />Phone: 1303) 866 7567 <br />FAX: 13031 B3:-B10G <br /> DEPARTMENT OF <br />October 27, 1997 NATURAL <br /> RESOURCES <br />Frank Butala <br /> Roy Romer <br />Butala Construction Company Governor <br />7625 US Hwy 50 ~amess. L«hheaa <br />P O Box 907 Executive Dv«lor <br /> <br />Salida,CO 81201 Michael B. Long <br />Dwlslnn Dlrec,nr <br />Re: Butala Gravel Pit, Permit No. M-77-170, Receipt of 112 Construction Materials Reclamation <br />Permit Amendment Application Package, AM-Ol -Incomplete <br />Deaz Mr. Butala: <br />On October 23, 1997, the Division of Minerals and Geology received your 112 Conswction Materials <br />Reclamation Permit Amendment Application package for the Butala Gravel Pit, Permit No. M-77-170. <br />Preliminary review of the information received determined that the following items must be received before <br />the Division can consider your application as being submitted and technical review can begin: <br />1) APPLICATION FORM: <br />(a) Only one copy of application was submitted, the rules require five copies of the application and <br />exhibits; <br />(b) The section required to be initialed by the applicant or their agent is not initialed; <br />(c) The signature on the signature page is not identified. <br />Please provide the required documents, forms or signatures. <br />2) EXHIBIT D - Minin¢ Plan (Rule 6.4.4): The mining plan shall supply the following information, <br />correlated with the affected lands, map(s) and timetables: <br />(a) description of the method(s) of mining to be employed in each stage of the operation <br />as related to any surface disturbance on affected lands; <br />(b) earthmoving; <br />(c) all water diversions and impoundments; and <br />(d) the size of area(s) to be worked at any one time. <br />(e) An approximate timetable to describe the mining operation. The timetable is for the <br />