My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP24427
DRMS
>
Back File Migration
>
Report
>
REP24427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:24 PM
Creation date
11/27/2007 3:58:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985211
IBM Index Class Name
Report
Doc Date
4/30/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATINS 110C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ey. `-/~°~ <br />_' -~ RECEIVED ~ ~~~~~~~~~~~~~~~~~~~ • I cK•. I yZ `l~- <br />APR 3 0 1998 sss 1M1~ <br />Notice of Intent to Continue Mining Operations ® ~ Y <br />avisionofMinerals~Geology 110c Construction Materials Annual Report <br />Permittee Name: hleil Sprague ' <br />Permit No. h1-BS-211 <br />Operation Name: Berthoud Pink Quarry <br />Anniversary Date: April 29, 1998 <br />Total: $22[5. 00 (Due on your Anniversary Date) ~ ~ r <br />1, a. Permitted acreage: ~„ 7 b. County where mine is loc ted: KJU ( mfr <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Does this mine operate MORE or LESS than 180 days per year? MORE ESS <br />}\~ Does this mine have a phased reclamation plan? Y~ NO <br />9. Total acres affected during the report year:' ,~. 9 <br />5. Total acreo reclai^:ed for the report year:' ~_ <br />. 6. Total number of acres in topsoil replacement stage: ,~_ <br />a. Average thickness of topsoil replaced: ___ <br />7. Total number of acres seeded: <br />a. List species seeded S seeding rate for report year on back ''++ ^^ <br />B. For non-phased operations provide dales extraction ceased: IV n <br />ti <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic materia or soil <br />conditioners used for the report yea x~:* <br />10. Estimated two tal acres to be affected in thl e~ next report year:* I7~ <br />11 . COMMENTS : 1 1~9.~.Q 0.r Q b~d Q UO,~ f ~ 51 KS QYId IY1.11'la h,9, l S S I I ~2111R~ <br />* Please show the location of Che act'e age for items 9 - 6 on your m p**. Indicate <br />the phases of the reclamation which have been completed, correlated with your timetable. <br />For phased operations show dates extraction ceased and dates reclamation began. <br />*• NoTE: If there have not been any changes since the last annual repor and you <br />previously submitted a map which correctly depicts the current acreage i items 2 through <br />6, then a new map is unnecessary. However, this must be stated above. <br />nn 1 <br />Signature: L' ~-~ Q Date: <br />Please type or print current con-ftact name, mailing address, and phone n er below: <br />Contact Name: ~(~1`,~~.~\ltA~ ~(QO112 Phone: 3-I ~ <br />/~ ~ {, P //` FAX N0 : ~ 3 3 <br />Company: I-T(C~(l~lll~~.~~~. 1-~~ . <br />Address: , 5n~5 (~r2 a? <br />Co P,c;s~ <br />Federal Tax ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.