Laserfiche WebLink
~~ <br />1~ <br />~~ <br />1~ <br />1~ <br />~~ <br />i <br />1~ <br />~~ <br />-~ <br />1~ <br />1~ <br />1~ <br />1~ <br />1 _~ <br />1~ <br />1~ <br />1~ <br />1_~ <br />r~ <br />TABLE OF CONTENTS <br />(CONTINUED) <br /> <br />2.2 . <br />EXECUTION PAGE <br />g <br /> 2.2.1 Clearing B <br /> 2.2.1.1 General 8 <br /> 2.2.1.2 Grubbing 9 <br /> 2.2.1.3 Waste Material Disposal 10 <br />SECTION 3.0 - EXCAVATION 11 <br />3.1 GENERAL 11 <br /> 3.1.1 Scope of Work 11 <br /> 3.1.2 General Conditions 11 <br /> 3.1.3 Excavated Material 12 <br />3.2 UNSUITABLE MATERIAL 14 <br />3.3 STAGED CONSTRUCTION 14 <br />3.4 PREPARATION OF FILL AREAS 15 <br /> 3.4.1 Stripping 15 <br /> 3.4.2 Excavation 15 <br />3.5 EXCAVATION BELOW STRIPPING 16 <br />3.6 PREPARATION AND EXCAVATION OF BORROW AREAS 16 <br /> 3.6.1 General 16 <br /> 3.6.2 Moisture and Drainage 16 <br /> 3.6.3 Stripping and Waste 17 <br /> 3.6.4 Disposal of Excavated Material 18 <br />SECT ION 4.0 - STABILIZED SLOPE CONSTRUCTION 19 <br />4.1 GENERAL 19 <br />4.2 FOUNDATION PREPARATION 19 <br />4.3 PLACING EMBANRMENT MATERIALS 20 <br />