Laserfiche WebLink
iiiiuiiii iii <br />999 <br /> <br />RECEIVED <br />May 08, 1998 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />MAY 11 ~ggg <br />Division of Minerals 8 Geology <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />_ DMG Permit No. M-88-1i2, TR-010 <br />Weekly Pond Compliance Report <br />May 03 - May 09, 1998 <br />Dear Mr. Dillie:~R .1~ <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of May 03 <br />May 09, 1998 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.085 ppm CN-wad and 0.085 <br />ppm CN-total. The collection pond averaged 0.015 ppm CN-wad and 0.085 <br />ppm CN-total. <br />Sincerely, <br />~~ ~yLfil?~LLf/-rt.cX/ <br />Ron Zumwalt <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />