Laserfiche WebLink
<br />ANNUAL REPORT <br />INSTRUCTIONS <br />• <br />According to C..R.S. 34-33-I 16(3), and C.R.S. 34-325-1 l6(3)(a), on [he anniversmy date of the permit each year, <br />the operator shall submit a report and a map showing the extent of current disturbances to affected land, <br />reclamation accomplished to date and during the preceding yea, new disturbances that are anticipated to occur <br />during [he upcoming year, and reclamation that will be performed during the upconung yea. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled map that clealy dzlin?arcs and includes <br />the above elements may suffice for a written report.) <br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report the [ollowing information as required by '_ CCR 407-1, 407-4, and Rules <br />1.13.7(1)(a): <br />(I) the condition of the operation at the time of cessation: <br />(ii) what specific measures have been and will be implemented to comply with reclamation, <br />performance standards and Environmental Protection Plan requirements, if they are pazt of your <br />approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Report, as applicable: <br />(a) Per the requirements of 2 CCR 407-1.407-4, and Rules 1.15(11, provide an updated statement <br />regazdine the sufficiency of [he value of the Financial Warranty, specifically: <br />(I) Per the requirements of 2 CCR 407-1.407-4, and Rules 1.1~(] i(a), provide an updated <br />statement regazding the sufficiency of [he value of the financial wan-anty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salva;e <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407-1, and Rules 1.1~(1)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a yua]ified <br />independent appraiser, indicating any changes in property value, anti a statement summarizins <br />any circumstances which may affect the adequacy of the Deed of 7-rust, or Security Agreement, <br />and the value of the property subject to either of these instruments. <br />The repon shall also provide proof that there are no past-due propterty taxes. <br />(iii) Per the requirements of 2 CCR 407-1, 407, and Rules 4.713), permits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Cettified Public Accountant, demonsvatine that the <br />Letter of Credit does not exceed ten percent (10%) of the bank's capita] surplus accounts. <br />(vi) Per the requirements of 2 CCR 407-1, 407-4, and Rules -1.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures <br />and equipment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.1~(1)(c), all monitoring information <br />required as part of the approved permit application, to include [hz Environmental Protection Plan. <br />iPlease note that if you ae not a Designated i`]inine Operation, you will not have an Environmental <br />Protection Plan as pan of your approved permit.) <br />