My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP24148
DRMS
>
Back File Migration
>
Report
>
REP24148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:15 PM
Creation date
11/27/2007 3:54:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977326
IBM Index Class Name
Report
Doc Date
11/18/1993
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110 2 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.~ <br />• • Ill lllllllllllll llll <br />Notice of Intent to Continue Mining Operations <br />llo(z) Annual Report >,!OV 1 8 ~°9 <br />Permittee Name: Colorado Refractories Corp <br />Permit No : M-77-326 <br />Crrie~c°N <br />'..:~~.-~_u~~y`yl~ <br />Operation Name: Siloam Mine* <br />Anniversa ry Date: 11/23/93 <br />Total: 5225.00 (Due on your Anniversary Date) <br />1. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Does this mine operate MORE or LESS than 180 days per year? MORE LESS <br />c. Seeded: replaced: <br />List species seeded & seeding <br />rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:' <br />8. Estimated total acres to be affected in the next report year:* /Van , <br />2a. Financial Warranty: ~SC2~.I~Ov~ 2b. Permitted acreage: G~[O r~0/~S <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:* /Uon 2_ <br />5. Total acres reclaime d for the report year:* Nvr)c~ <br />6. Total acres in vario us stages of reclamation:' <br /> a. Backfilled: d. Topsoil replaced: <br /> b. Graded: Average topsoil thickness <br />9. COMMENTS: <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: C Date: <br />Please type or print c rrent contact name, mai g address, and phone number below: <br />i <br />Contact Name: Phone: (7I~I )o?75-7,~~5" <br />Company: - CD• ~FFI~W-GTOeI~ p((~~CSIU~ <br />Addre;~: p.(7. ~ /.~~ <br />Federe~ Tax ID No. or Social Security No.: /y /~7/y~~ _._ ~~ l~\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.