Laserfiche WebLink
I <br />.I <br />___.. ~.__._-___... _._~. _________-_h <br />11- <br />C~._OMPANY ____ _ <br />THE LAKEWOOD BRICK AND TILE ~r <br />:. <br />.. _ - - - <br />' Manufacturers Of • FACE 8 PAVING BRICK • SPECIAL SHAPES 8 THIN ERICK VENEER ~i <br />OFFICE AND YARDS: 1325 JAY STREET ii <br />LAKEWOOD, COLORADO 80214.2052.7Ef•El yOftE, t303~,233-¢313,_1;_,._ <br />~~ FAX'i363) 237-7737 ',~ - ~ - - - - -l,i~-- - <br />.. ~' _____1L___ ___ _~~ <br />February 13, 2002 <br />Mr. Cazl Mount <br />Division of Minerals and Geology <br />Minerals Section <br />1313 Sherman Street, Suite 215 <br />Denver, Colorado 80203-2273 <br />Deaz Mr. Mount: <br />Re: Lakewood Brick and Tile Co. <br />Church Pit, Annual Report <br />MLRB Permit ~ M-79-045, <br />Anniversary Date 2/28/02 <br />FEDERAL TAX TD. H <br />RECEIVE® <br />FEB 1 3 2v~?. <br />Division of Minerals and Geology <br />This annual report address mining of both material being removed from the site. Each is <br />mined by a different operator using this single permit. This pit HAS NOT been granted a Temporary <br />Cessation and it HAS operated more than 180 days this yeaz. The approved bond amount is $84,200 <br />covering 75.74 acres ±, and the facility has seven mining and reclamation phases. Please refer to the <br />2001 Annual Report Map for the azeas discussed in this text. <br />We will deal specifically with the Annual Report requirements as outlined in Rule 1.15 of the <br />Rules and Regulations and those noted in the annual letter. <br />(1) Clay - No new azea was disturbed by the clay mining operation this yeaz. We continued to <br />mine deeper on the land previously disturbed (blue) north of the ditches in Stage II. Approxi- <br />mately 23.21 acres is disturbed by the clay operation in Stages O, I and II. This included the <br />old clay mined azea south of the ditches, the Clay Plant Site (purple) and the storage azea <br />(tan). A small azea of 0.18 acres was mined in area stripped in previous yeazs (//n. <br />Gravel - No gravel mining took place this yeaz. A total of 11.94 acres has been stripped in <br />Stage A to prepare it for mining (magenta). The gravel operation has disturbed 23.03 acres <br />± in the mine. Some pit run material was removed for use by the mineral owners from the <br />gravel processing azea. <br />(2) No reclamation was required this yeaz. Filling continued on the old clay mining azea in the <br />green azea on the north end of Stage O. No additional reclamation is required until mining <br />for both materials is completed in any given stage. <br />