Laserfiche WebLink
iii iiiiiiiiiiiiiiu <br />999 <br /> <br />QUARTERLY INSPECTION REPORT <br />COAL WASTE BANKS <br />Rules 4.09(11) and 4.10(2)(2) <br />Mine: <br />Date: S/S~O~ <br />DD <br />Waste Bank <br />General Description or Reference to Site Plan: <br />^ Cyolden Eagle -Exhibit 17, pages 2.05-19, 2.05-25 (a) through (c) <br />New Elk -Exhibit 30, pages 2.05-27 through 2.05-44 <br />Activity During Inspection: <br />^ Removal of Topsoil at Organic Matter <br />^ Installation of Surface Drainage System <br />^ Placement of Underdrain(s)' <br />^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction <br />and/or discharge, integrity of 100-year24-hourappurtenant drainage structures, evidence of positive <br />drainage. /' <br />/Vo ~Id ~r`t~ O"(' SQ~r~/ICl'S ®r ctG-Fr/~ $C~PQ~~ w'4s ©~Se~~~ <br />Observations of Fill Construction: Include description of material, compaction, lift thicknesses, <br />slopes of sidnes and faces, construction methodology. <br />P/'Dot('0~~ Waj 06Se~r2°cl Nsi//n~ u /a+ad~ Y~~l~i°M 4X1 ~'~ <br />(,l~ ~id Y1iT{ ObSC/'uG 4+L°4S C'.Yryr ~ l7^J ~,k'CPSS. ve o~t°jC~~G~On <br />Uhler wllee/ /o~S Sonfe Mir10I` ~i°~'lecy-lam c,~As ods~r~eJ <br />sever I a'~3 1 ~ ~~. fl~ ~, m <br />-emu. ~e-~(S <br />Job No. 28,170 <br />~x-e, ~D o~ ~GL l ~D~~i ~ <br />Page 1 of 2 <br />