Laserfiche WebLink
W ~ /W/~~~e~~s//,,,,t~~ern ~ <br />/Y/ULJ/~ <br />August 31, 1990 <br />iii iiiiiiiiiiiu iii <br />999 Western Mobile/Northern <br />~ 1&70 North TeR Hill Ad. <br />- P.O. Box 2187 <br />Fort COIIInS, Colorado 80.522 <br />303-482-7854 <br />534-4583 Metro <br />Fax 30.?-22455f14 <br />Mined Land Reclamation Board <br />1313 Sherman Street <br />Room 215 <br />RE: Annual Report, MLRB Permit No. M-77-081 <br />Greeley West Pit <br />Anniversary Date: 09/12/90 <br />Dear Board Members: <br />RECEIVED <br />SEP 4 1990 <br />Mined Land <br />Reclamation Division <br />In compliance to the Rules and Regulations of the Board, <br />please find enclosed a check #76771 in the amount of $350, <br />full payment of the annual fee. Also, as required, the <br />following information is provided for the annual report. <br />1) In this reporting period approximately 4.5 acres <br />were stripped and approximately 2 acres of this area <br />were mined. The affected area is in the southern <br />portion of the pit directly adjacent to the recently <br />mined southwest corner indicated in the photograph <br />as area #1. <br />2) There was no reclamation completed at this site for <br />this reporting period. <br />3) Acreage in the various stages of reclamation <br />affected this past year include the dike immediately <br />west and the bank on the southern edge of stripped <br />area. Overburden was placed and sloped but no <br />topsoil was placed or vegetation planted. The <br />acreage affected was approximately .62 acres and is <br />shown on the photograph as area #2. <br />4) No vegetation was planted this year. <br />5) No fertilizers or soil conditioners were applied <br />this year. <br />6) Previous reclamation efforts appear to be moderately <br />successful. Slopes are stabilized and vegetation is <br />prospering adequately. <br />7) It is estimated that the remainder of the stripped <br />area will be mined this coming year, approximately <br />2.5 acres. Reclamation will contimie along the east <br />side of the dike with some topsoiling and seeding <br />expected on the completed areas. <br /> <br />8) The effective date of this report is 8/31/90. <br />