Laserfiche WebLink
M i <br />ANNUAL REPORT <br />INSTRUCTIONS <br />According to C.R.S. 34-32-I 16(3), and C.R.S. 34-32.5-I 16(3)(a). on the anniversary date of [he permit each year, <br />the operator shall submit a report and a map showing the extent of current disturbances to affected Ittnd. <br />reclamation accomplished to date and during the preceding year, new disturbances that are anticipated to occur <br />during the upcoming year, and reclamation that will be performed dtiririg the upcoming year. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates. and includes <br />the above'elemenis may suffice far a written report.) <br />If your operation is subject to the provisions of Temporan' Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report the following information as required by 3 CCR 407-1, 407-4, and Rules <br />1.13.7 (1)(a): <br />(i) the condition of the operation at the time of cessation; <br />(ii) what specific measures have been and wil{ be implemented to comply with reclamation, performance <br />standards and Environmental Protection Plan requiremenu., if they are part of your approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide [he additional following information with your Annual Report, as applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules l.l~(1), provide an updated statement <br />regarding the sufficiency of the value of the Financial 'vVananty, specifically: <br />(i) Per the requirements of 2 CCR 407-1.407-4, and Rules 1.15(I)(a), provide an updated <br />statement regarding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-], 407-4, and Rules I.IS(l)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement, <br />and the value of the property subject to either of these instruments._ The re_ port shall also pro~•ide <br />- _ - - proof that there are no past-due property taxes. <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Certified .Public Accountant, demonstrating that the Letter of <br />Credit does not exceed ten percent (1090) of the bank's capital surplus accounts. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures and equipment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules I.I~(1)(c), all monitoring information <br />required as part of the approved permit application. to include [he Environmental Protection Plan. (Please <br />note that if you are not a Designated Mining Operation, you will not have an Environmental Protection <br />Plan as pan of your approved permit.) <br />