My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP23957
DRMS
>
Back File Migration
>
Report
>
REP23957
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:08 PM
Creation date
11/27/2007 3:51:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992051
IBM Index Class Name
Report
Doc Date
8/3/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(~e~' Sz 7~ <br /> ~ III IIIIIIIIIIIII III ~ ~~~. ,~ ~ ~ ~r <br /> <br /> RECEIVED <br /> Notice of Intent to Continue Mining Operati s <br /> 112c Construction Materials Annual Report ~ 3 ~O <br />~l DiV <br />Permit tee Name: Florence Sand & Gravel <br />Permit No. M-92-051 DIV <br />OF MINERALS <br />Operat ion Name: Florence Sand & Gravel Pit . <br />8 GEOLOGY <br />Annive rsary Date: August 11, 1998 <br />T_o tal: $550.00 (Due on your Anniversary Date) <br /> f~e~o~r <br />1. a. Permitted acreage: 3 .5 b. County where mine is located: <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br /> Does this mine operate MORE or LESS than 180 days per year ? MORE LESS <br />3. Does this mine have a phased reclamation plan? YES nJ0 <br />4. Total acres affected during the report year:' .~• C7 <br />-5.. - -TOta Las-rev_r.~claimed__€or~-.'~a-sepn-r t_yga r:-! -- -___ _- _ _ . _ _ ~ <br />6. Total number of acres in topsoil replacement stage: O <br /> a. Average thickness of topsoil replaced: O <br />7. Total number of acres seeded: ~ <br /> a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: =~ <br /> a. Date reclamation began: .2///~ <br />9. The type and approximate quantity of fertilizers, organic material or soil <br /> conditioners used for the report year:* nJ~f'f <br /> ' 7-IJ <br />10. Estimated total acres to be affected in the next repor <br />t year: <br />11. / <br />COMMENTS: ~In i.>` dq O,O~r1~ ~0 ..: o K- ~ /I/97 <br />' Please show the location of the acreage for items 4 - 6 on your map ". Indicate <br />the phases of the reclamation which have been completed, correlated with your timetable. <br />For F~hased operations show dates extraction ceased and dates reclamation began. <br />** NCrPE: If there have not been any changes since the last annual report and you <br />previ pusly submitted a map which correctly depicts the current acreage ir, items 2 thrcugh- <br />6, then a new map is unnecessary. However, this must be stated above. <br />Signature: ~ ~ ~~ov~2~-may Date: ~j%// o <br />Plea=_:e type or print current contact name, mailing address, and phone number below: <br />contact Name: 7v ~ (~n ~a~-Vrto/ Phone: ( ~/`~ I ~7a-~aS <br />FAX NO: <br />Company: ~~ov e,~Cp S~„L.~ c~~r.,, JP~ <br />Address: 7q! ~~~ ~l~` <br />~~N-o~ ~, _ ~~~xa <br />Federal Tax ID No. or Social Security No.: ~IYI - /~'7 - 0 % ~ 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.