Laserfiche WebLink
iii iiiiiiiiiiiii iii <br />999 <br />RF_CEI~EC <br />FED 0 n ~I~:,y <br />February O1, 1999 J~?4,~;e~1S8000109y <br />~,,: <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />January 24, /1/y9J~90~19 - January 30, 1999 <br />Dear Mr. Dillie: ~.{:l- <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of January 24, <br />1999 - January 30, 1999 as required by the approved TR-010. <br />During the week, the tailings pond averaged <0.010 ppm CN-wad and c0.010 <br />ppm CN-total. The collection pond averaged 0.016 ppm CN-wad and 0.055 <br />ppm CN-total. <br />Sincerely, <br />Ron Zumwalt <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />