Laserfiche WebLink
<br /> <br />Mr. Richard Hughes - 2 - July 8, 1988 <br />7. Several sites are sampled more than is required. We appreciate <br />this, and certainly do not object to receiving the additional <br />information. Please be sure, however, that the extra sampling is <br />not substituted for required samples during subsequent quarters. <br />We understand that extra samples may be useful immediately prior to <br />winter to avoid missed samples due to site inaccessablity. <br />Eckman Park, Mine 1, and Mine 2 <br />Bedrock Wells <br />All frequencies were met during the first and second quarter of the <br />1987-1988 water year. Please refer to number 4 above. <br />Alluvial Wells <br />1: All frequencies were met during the first and second quarter of the <br />1987-1988 water year: <br />Spoil We11s <br />1. Ammonia (free) was not analyzed for the Novermber 1967 samples at <br />wells 026-SP-1 and 026-SP-2. Please explain the omissions and <br />verify that all required constituents will be analyzed for all <br />future samples: All other requirments were met. <br />Springs <br />1: The second quarter printout contains only data for Spring 114, <br />although the first quarter printout contains data for several <br />springs. The future printouts should be cumulative throughout the <br />year: <br />2: The data do not reflect any second quarter field parameter <br />measurements for Springs A-2, C-1, and Dcomp. We acknowledge that <br />two field parameter measurements were obtained during the first <br />quarter; however, these sites were accessible in March 1988. In <br />fact, measurementsJvere taken during our March 1988 inspection. <br />Please incorporate the March 1988 inspection measurements into your <br />data base so that the second quarter requirements are complete for <br />these sites. <br />3. Spring B-3 appears in the printout; however, no data exists. <br />Initially, it seems that the monitoring requirements have not been <br />met for this site. Was the spring dry or inaccessable during the <br />first quarter; the site was accessible in March 1988. Please <br />explain the lack of data for this required monitoring site. <br />