Laserfiche WebLink
III. AREAS MINED IN 2002 <br />3.01 Central Quarry <br />Mining was completed in the Central Quarry by December 2001. The Central Quarry is <br />currently being used as a water storage reservoir, serviced by a water transmission line <br />installed along the road on the west side of the quarry. <br />3.02 North Quarry <br />During 2002, mining was completed within the north and east sections of the North Quarry <br />on Benches 3 and 2. Final highwalls were completed on the north side on Bench 3 and 2, to <br />approximate elevation 6,545 ft. Mining continues within the central and eastern parts of the <br />in North Quarry on Bench I. Mining has generally continued in a sequence of 60-fr <br />highwalls with benches 40-60 ft wide. <br />3 <br />® G:\PROI ECTS\20200Moaison Quarry\008\2002\2002 geotechnical addendum.doc <br />