My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP23816
DRMS
>
Back File Migration
>
Report
>
REP23816
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:03 PM
Creation date
11/27/2007 3:49:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
7/15/2002
Doc Name
2001 Annual Subsidence Report
From
J.E. Stover & Associates
To
DMG
Permit Index Doc Type
Subsidence Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Station 82 Grosse-Rhode Ranch Site. This station was created in 1996 by UTE Engineering <br />• and Surveying Company to replace previous Station 96. Discrepancies concerning <br />stations 94, 96, 97 and 98 required new stations to be established. The 2001 <br />survey data indicates an elevation gain of 0.75 feet when compazed to the June <br />2000 elevation. <br />Station 83 Grosse-Rhode Ranch Site. This station was created in 1996 by UTE Engineering <br />and Surveying Company to replace previous Station 97. Discrepancies concerning <br />stations 94, 96, 97 and 98 required new stations to be established. No survey data <br />was reported for this site during 1998. The 2001 survey data indicates an <br />elevation gain of 1.11 feet when compazed to the June 2000 survey. <br />Pitkin Mesa Pipeline <br />Seven subsidence monitoring stations were established at locations along the Pitkin Mesa Pipeline <br />which overlies Panel C. Panel C development commenced in October with twenty-four crosscuts <br />completed by January 1, 1993. Panel C was mined utilizing a partial extraction design intended to <br />preclude the development of subsidence in order to protect the pipeline. The subsidence <br />monitoring stations along the pipeline aze depicted on Map No. 2-SA. The stations were <br />surveyed once in 2001; November 19. The results of this survey is appended to this report. The <br />2001 survey was conducted by Cragg Surveying. The Cragg survey will provide consistent <br />survey values in the future which will show that this azea is stable. Surveys will continue <br />approximately semi-annually until stability is documented. <br />• Visual Monitoring 2001 <br />Visual subsidence monitoring is accomplished by periodic "walkovers" of recently mined azeas <br />within the present permit area. Walkovers aze generally done in conjunction with survey <br />monitoring due to the seasonal accessibility of the azea. During the 2001 monitoring season, <br />visual monitoring consisted of visual inspections done while performing survey monitoring and <br />water monitoring. <br />Visual monitoring is concentrated over azeas of retreat mining with particulaz emphasis on areas <br />mined under low overburden. Since the mine has now been idled in excess of 4 yeazs, there aze <br />no azeas of particulaz emphasis on which to concentrate visual inspections. <br />Projected Subsidence Impacts - 2002 <br />Subsidence impacts during 2002 are projected to be minimal based upon subsidence patterns <br />established to date. No mining is currently projected for 2002. <br />Projected Subsidence Monitoring - 2002 <br />Per the conditions of Technical Revision 16, the operator is required to inform the Division of <br />selected sites proposed for surveying for the upcoming yeaz. For the calendaz 2002 yeaz, the <br />operator proposes the following twenty (20) sites for surveying (see Map No. 2-5 appended to <br />this report): 6, 14, I5, 16, and 95; Drill hole location 55, 65, 66 and 68; structure locations in the <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.