Laserfiche WebLink
<br /> <br />been identified ae to its location and source, inflow rate, <br />pH, temperature and conductivity. <br />Consumptive water use in the mine was calculated both in coal <br />production rates and domestic water usage. Estimated water <br />inflow is estimated at 173.3 gpm at Golden Eagle. 93.3 gpm <br />were discharged to the surface from the mine inflows. No <br />discharge of water from the New Elk Mine has occurred since <br />the mine was temporarily sealed in the month of June 1989. <br />Mine water discharge is through MDGE-1 and was monitored and <br />analyzed for chemical parameters monthly through the year as <br />per Stipulation 15 commitments. <br />4. Spring and seep survey per Stipulation 9A is complete. <br />This concludes the Division's Annual Hydrology Report review for <br />the 1992 water year at the Golden Eagle/New Elk Mines. Please <br />address the above issues and forward your explanations to the <br />Division as soon as is possible for continued review. <br />m:\coal\jjd\ahreviev.93 <br />5 <br />