My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP23785
DRMS
>
Back File Migration
>
Report
>
REP23785
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:56:02 PM
Creation date
11/27/2007 3:49:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978349
IBM Index Class Name
Report
Doc Date
12/23/1996
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II IIIIIIIIIIIIIIII~ r <br />899 <br /> <br />Notice of Intent to Continue Mining Operations C7Cr EIVED <br />112c Construction Materials Annual Report gf1f1 <br />Permit No. M-78-349 Ut(+ Z 3 IJJ6 <br />Operation Name: Dick Casey Concr Pit <br />Anniversary Date: December 20, 1996 <br />Annual Fees for the Year (s) : 1995 - 1996 D.~~Sio~, vi wIWU~d~S S Geology <br />Total: $550.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: 58.9 b. County where mine is located: Garfield <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES (NO) <br />Does this mine operate MORE or LESS than 180 days per year? MORE( LESS) <br />3. Does this mine have a phased reclamation plan? ( YES) NO <br />4. Total acres affected during the report year:* none <br />5. Total acres reclaimed for the report year:+ One ' <br />___ 6. Tntal number of .acres in.tonsoil sen.Lacement_staQe:.__ --__ <br />a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: <br />a. List species seeded ~ seeding rate for report year on back <br />S. For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* N/A J <br />_ __~1.O.J Estimated total acres to be affected in the next report year:* ) <br />11. COMMENTS: No Change in operations anticipated ' <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTH: If there have not been any changes since the last annual report and you <br />previously submitted a map wh' h co ectly depicts the current acreage in items 2 <br />through 6, then new map is nec ary. However, this must be statQe/d above. <br />Signature: Date: ~~-~~~/f7 <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: Shawn Vondette <br />Dick Casey Concrete CO. <br />Company: <br />Address: p.0. Box 1815 <br />Rifle, Co 81650 <br />Phone: ( 970-E)25-3489 <br />FAx ND: (970 ) 963-0180 <br />Federal Tax ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.