Laserfiche WebLink
• Bowie Resources Limited <br />Bowie #1 Mine <br />Quarterly Waste Disposal Area Inspection Report <br />1st Quarter - 1995 <br />Item Y N Comments <br />1. Quantity of waste material added to No waste material has been added to the <br />waste disposal area this quarter? N waste disposal pile this quarter. <br />2. Waste material deposited and No waste material has been added to the <br />compacted in 24' lifts? NA waste disposal pile this quarter. <br />3. Drainage alterations constructed? No drainage alterations were constructed during the <br /> NA quarter. The existing drainage pattern was maintained <br /> around the perimeter of the pile to protect outslopes <br /> and direct drainage at the toe of the pile. <br />4. Present height of waste material? Highest height approximately 99.0 feet. <br />5. New bench contracted? <br /> N <br />6. Refuse material outslopes placed at No waste material has been added to the <br />iV:2H outslopes? NA waste disposal pile this quar~r. <br />7. Adequate draitage on top of completed No waste material has been added to the <br />fill? NA waste disposal pile this quarter. <br />8. Bench drainage adequaoe? Bench drainage was maintained throughout the quarter. <br /> Y See Item 3. <br />9. Outslopes covered with 4' non-toxic, No waste material has been added to the <br />non-combustible material? NA waste disposal pile this quarter. <br />10. Berms constructed on outslopes? <br /> Y <br />11. Evidence of structural defects? <br /> N <br />12. Topsoil adequately salvaged and No additional topsoil was salvaged from this pile <br />stored? NA this quarter. <br />13. Trash removed? <br /> NA <br />14. Additional comments? Drainage control was monitored and maintained <br /> N throughout the 1st quarter of 1995. <br />I certify the above report as being accurate to the best of my knowledge. <br />~~~~~ <br />Signature <br />-~~~-yam <br />Date <br />