<br />VI. SUMMARY AND CONCLUSIONS <br />' Development of CAMAS' Morrison Quarry is continuing in general accordance with the <br />approved Mine Plan. Mining is continuing at the floor of the Central Quarry and in the <br />' North Quarry in accordance with the Observational Method presented and approved in [he <br />permit amendments and technical revision. Mining in the North Quarry has varied slightly <br />from the phasing presented in Amendments Nos. 4 and 5 to improve operational <br />considerations and to provide for adequate mining safety for personnel, but has not varied <br />from the planned ultimate buildout. <br /> Excavations performed during 1999 included final highwall completion of Bench A and B on <br /> the west and east side of the Central Quarry. Excavation on [he east side of the Central <br /> Quarry is progressing as planned with ground conditions improving compared to [hose <br /> assumed for the baseline stability condition. The repaired slope remained stable throughout <br />' 1999 based on continued optical survey monitoring. Excavation on the west side of the <br /> Central Quarry is currently being done with slopes having 50 f[ highwalls and 30 ft benches. <br /> In the North Quarry, final highwalls were completed on the northwest side of [he quarry for <br /> Bench 6, 7, 8, 9, 10, 11, 12 and 13. These benches and highwalls were excavated no steeper <br />' than IH:1 V, with highwalls generally no higher than 40 ft. Current mine slopes are presently <br />being excavated no steeper than 1H:1V <br />with hi <br />hwalls <br />enerall <br />no hi <br />her than 40 ft <br /> , <br />g <br />g <br />y <br />g <br />. <br /> <br />u <br /> <br /> <br /> <br /> <br /> <br />1 <br />1 <br />G~\PkUIECfS\?U?IXi Mumwn Quarry\IX~SU'N~\nvwnUmarkup Ja <br />